The Municipality has been informed by the contractor and the consultant engineer that repairs have been completed and Bolton River Bridge will be open to vehicular traffic by the end of the day.

Original Notice:  January 12, 2018

CLOSURE:  Bolton River Bridge:

Effective immediately and until further notice the bridge that spans the Bolton River is closed.   Residents and property owners on the Bolton River Road may access their properties via Bright Lake Road (if located north of the bridge) or Dayton Road (if located south of the bridge).  Bolton River Road is located in Ward 2 (formerly the Twp. of Day & Bright Additional) Road closure signs have been posted near the bridge and cement barricades installed at both ends of the bridge.  Please monitor huronshores.ca for updates.

 

Join the Mailing List

Subscribe to the Huron Shores mailing list. Receive periodic updates and announcements.